Gables Cherry Creek phase II

Gables Cherry Creek phase II

Gables Cherry Creek phase II

Design-assist project of an eight-story, 122-unit apartment complex with an integral parking structure. Work included a cast-in-place structure utilizing BIM and Total Station for placement of over 1,600 cast-in-place lighting and systems boxes, as well as electrical distribution, generator/EM distribution, branch wiring and power, installation of LED lighting throughout, lighting control system to meet AHJ requirements, power connections to mechanical equipment, fire alarm system and rough-in for low-voltage systems.

Owner | Gables Residential
Architect | Ziegler Cooper Architects
Engineer | MEP Engineering
General contractor | Gables Construction
Contract value | $2,671,827
Size | 314,752 square feet