Rio Tinto Minerals

Fast-track design-assist project to create a new centralized R&D lab. Work included the integration of three existing mineral analysis labs into one location, and the addition of a new large research lab area and related administrative areas.

Owner

Rio Tinto Materials

Architect

OZ Architecture

Engineer

Swanson Rink

General Contractor

Fransen Pittman

Contract Value

$2,263,950

Size

140,000 square feet